Jump to content

Kiri Robbie

Administrators
  • Posts

    85
  • Joined

  • Last visited

Posts posted by Kiri Robbie

  1. Question sent by David - I was wondering if there exists a design procedural document (preferably Australian-related standards or others) which outlines the delineation of scope between Permanent Works and Temporary Works engineers. I am aware of Clause 8 in "BS 5975-2019 - CoP for Temporary Works", however unsure if there is a direct correlation to related practices within Australia

×
×
  • Create New...