Kiri Robbie Posted December 10, 2020 Share Posted December 10, 2020 In the life cycle of deep excavation, where do you position the soil classification study to understand the ground conditions where the water table is? Link to comment Share on other sites More sharing options...
Martin Larisch Posted December 20, 2020 Share Posted December 20, 2020 The preliminary site investigation and soil classification should be done at concept stage. If required, additional investigation should be carried out for the detailed design. The certification of the pile base is part of the drilling/ construction phase and all three activities should be carried out by geotechnical professionals. Ground investigations and laboratory testing before the detailed design stage can greatly assist to create savings in the pile design and construction phase. The knowledge of the groundwater table and it's seasonal variations id important for both, conceptual and detailed design stages. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now